PRODUCT
  • Fasteners
  • Metal Packaging
  • Extrusion Aluminum Profile
  • ABOUT US
    Tel:0512-58991138
    Mob:18962238488
    Fax:0512-58991139 
    Add:Room 8317,3/F Chenlong Building,No.288,Jingang Dadao Road,Zhangjiagang City,Jiangsu Province
    Email:sales@sunfastind.com 
    Solar energy frame aluminum profile
    Your present location: HOME >> Solar energy frame aluminum profile

    solor energy frame

    solor energy frame
    Product name:solor energy frame
    Category:Solar energy frame aluminum profile
    Popularity:1935
    Date:2015-12-04 15:42:39
    Inquiry

    Product














    The specifications 
    1Business type:Manufacturer and trading
    2Standard:GB 5237-2008
    3Product series:Aluminium profile for building material and industrial materail
    4Price:Based on SMM Aluminium Ingot price(www.smm.cn) + mold cost+processing Fee
    5Payment term:T/T, L/C at sight.
    6Surface             treatment:Mill finish, Anodizing, Powder coating, electrophoresis, wooden finish, Polish, Brush, sandblasting,and others.
    7Specification:A. Alloy: 6063, 6060, 6061, 6005, 7005, and others
    B. Wall thickness: over 0.8mm
    C. State: T4/T5/T6 ,and others
    D. Length: 1m-7m
    E. Normal Anodizing thickness: 8-12 micro
    F. Normal powder coating thickness: 60-100 micro
    G. Tensile strength: ≥ 16 mpa
    H. Yield strength: ≥ 110 mpa
    I. Extensibility: ≥ 8%
    J. Hardness(HW): ≥ 8
    8Packing:Foam Paper and Carton Box package,Kraft Paper package,Plastic Film and the Plastic Wrap package etc. Customized acceptable!
    9MOQ:1ton/szie while 1*20’  FCL per order
    10Delivery time:10-20 days after the mould is ready
    11Normal order    sequence:1. Confirm the drawings, colors and price;   (1~2 days )
     
    2. Pay the mould fee and we strat to make moulds;(10days)                     Free sample will be sent for reference;
     
    3. We send samples to you for your confirmation;  (depend on you)
     
    4. Make the payment of 30% deposit, start production and package;            (10-20 days)
     
    5. Delivery.

     Production Process








    Previous:Nothing
    Next:Nothing
    Copyright©2015 Zhangjiagang Sunfast Industrial Co., Ltd All rights reserved 苏ICP备19046846号-1